Catalogue · 10 models

Prefab house catalogue with prices and photos.

From 100 to 350 m², single or two-storey, with 2 to 5 bedrooms. All at a fixed price, with the architectural project, building licence and site supervision included.

Price list

All prices.

ModelFloor areaStoreysBedroomsPrice + VAT
Model 100100 m²12 or 3€156,000
Model 125125 m²23 or 4€193,000
Model 150150 m²13 or 4€205,350
Model 160160 m²23€263,500
Model 175175 m²24€247,275
Model 200200 m²23€282,600
Model T200200 m²24€305,500
Model 250250 m²15€353,250
Model 300300 m²25 + study€423,900
Model 350350 m²25 + gym€494,550

Prices include the architectural project, building licence and site supervision. VAT not included. Transport, earthworks, special foundations and utility connections are quoted according to the plot.

Frequently asked questions

About the catalogue.

How much do the prefab houses in the catalogue cost?

They range from €156,000 + VAT for the Model 100 (100 m²) to €494,550 + VAT for the Model 350 (350 m²). Each price covers construction and technical work, with the architectural project, building licence and site supervision included.

What does the price of each model include?

Geotechnical and topographic survey, basic and execution project, continuous concrete slab foundation if the ground allows, site supervision, health and safety coordination, installation on your plot, electricity and water certificates and final documentation.

What is paid separately?

Whatever depends on your plot: transport of the modules, earthworks, special foundations if the geotechnical survey requires them, and the utility connections. Also VAT and the building licence fees and taxes.

Which prefab houses are single-storey?

The Model 100 (100 m²), the Model 150 (150 m²) and the Model 250 (250 m²). The rest are two-storey.

Can the layout be changed?

Each model has several bedroom and porch options, and you choose the materials, colours, finishes and roof type. Larger changes are assessed by our technical team.

How long does it take to get the house?

Once the licence is granted, the building work takes about six months: the modules are made in the factory while the foundation is laid, and assembly on the plot takes a few days.