Building Licence in Spain for a Prefab House: What You Need

Does a prefab house in Spain need a building licence? Yes, like any home. Which land you need, what documents to submit and what to check before buying.

Exterior of the two-storey Model 125 prefab modular home

Yes, a prefab house needs a building licence (licencia de obra), just like any other home. It makes no difference whether it is made in a factory or built on the plot: if it sits on a foundation and is meant to be lived in, the town hall (ayuntamiento) has to approve it. To get that approval you need a buildable plot and an architectural project signed by a qualified professional.

Here we explain what type of land you need, which documents are submitted, what is included in our price and what to check before buying a plot.

Why you need a licence

Some people think a prefab house is like a caravan or a garden shed. It isn't. A modular home like ours sits on a reinforced concrete slab, has electricity and water installations, and stays on the plot for good.

In the eyes of the law, it is a residential building. That is why it needs the same permits and must meet the same technical standards as a house built the traditional way, starting with the Spanish Technical Building Code (Código Técnico de la Edificación).

What land you need

This is the most important point, and the one that causes the most problems.

Urban land

This is the simplest case: a plot on urban land (suelo urbano), with a street and services, where the local planning rules allow residential use. Even so, every plot has its own conditions: how much you can build, how high, how far from the boundaries and what percentage of the land the house can cover.

Land zoned for development

It depends on whether the area has already been developed. If the infrastructure (urbanización) has not yet been built or approved, it may not be possible to build yet. Ask the town hall what stage it is at.

Rural or non-developable land

Building a home on rural land (suelo rústico) is heavily restricted. It is only allowed in specific cases and under conditions set by regional and municipal regulations. A cheap rural plot does not mean you can build on it. A prefab house is not a way to get around this rule.

Check the plot before you buy it

If you don't have land yet, this is the best advice we can give you: don't buy without knowing what can be built.

Before signing:

  1. Ask the town hall for a planning report or certificate (informe or certificado urbanístico) for the plot. It will tell you how the land is classified and what can be built.
  2. Check the parameters: maximum built area, number of storeys, plot coverage and setbacks.
  3. Look at the services: whether electricity, water and sewerage are nearby and how many metres away.
  4. Pay attention to access: the modules arrive by lorry, so the road to the plot matters.
  5. Request a land registry extract (nota simple) from the Property Registry (Registro de la Propiedad) to see whether there are any charges on it.

With that information you can see which model fits. A plot where only a single storey is allowed, which suits a Model 150, is not the same as a small one that calls for building upwards, like the Model 125.

Which documents are submitted

Each town hall has its own procedure, but for a new home the usual documents are:

Document What it is
Licence application The town hall's application form
Basic project Defines the house: plans, floor areas and compliance with planning rules
Execution project Sets out how the house is built. Usually required before work starts
Health and safety study Organises safety on site
Appointment of the site management team (dirección facultativa) Who supervises the works and their execution
Proof of payment of fees and taxes What the town hall charges for the licence

The fees and the construction tax are set by each municipality. Ask your town hall how much they are.

What our price includes

A good part of what you need for the licence is already included in the fixed price of the house:

  • Geotechnical and topographic survey of the plot.
  • Basic and execution project for the licence.
  • Site supervision and construction management.
  • Health and safety coordination.
  • Electricity and water certificates (boletines) and final documentation once the house is finished.

What is not included are the fees and taxes charged by the town hall, because they vary from one municipality to another.

You can see the prices of all the models in the price table. They range from €156,000 + VAT to €494,550 + VAT.

How long the licence takes

It depends on the town hall. Some municipalities decide sooner and others take longer. The procedure is the same for a modular home as for a traditional one.

What does change is what comes afterwards. Once the licence is granted, our build takes about six months: the modules are manufactured while the foundation is laid, and assembly takes days. You can see the full process in how it works.

Common mistakes

These are frequent errors when looking for a plot:

  • Buying rural land thinking a prefab house doesn't need a licence.
  • Assuming you can build any house on an urbanisation. Many have their own rules on height, roof or façade.
  • Not checking access. A narrow road or one with tight bends makes transporting the modules harder.
  • Not asking about services. If electricity or water are far away, the utility connections cost more.
  • Confusing the building licence with the first occupancy licence (licencia de primera ocupación). They are two separate procedures.

After the build

Once the house is finished, you need the final documentation and the electricity and water certificates to have the supplies connected. Depending on the municipality, you will also have to apply for the first occupancy licence or submit a first occupancy declaration (declaración de primera ocupación). Ask your town hall what they require.

If you are going to finance the house, the licence is also what the bank will ask for. We explain it in mortgage for a prefab house.

Get your quote

If you have a plot, or are thinking of buying one, tell us where it is. We'll help you see which model fits and give you a quote for the house, including the items that depend on your land. Write to us using the quote form or call us on +34 966 448 285.

Frequently asked questions

Common questions.

Does a prefab house need a building licence in Spain?

Yes. A prefab house installed on a foundation to live in needs a building licence, just like a house built the traditional way.

Can I put a prefab house on rural land?

Generally not as a standard home. It is only allowed in specific cases regulated by each region and each municipality. Before you buy, ask at the town hall.

How long does a building licence for a prefab house take?

It depends on the town hall. It is the same procedure as for a traditional house, so the timeframe is whatever your municipality takes for building licences.

Who prepares the architectural project for the licence?

A qualified professional drafts it. For our houses, the basic and execution project is included in the fixed price.