Building a house in Spain costs the sum of three blocks: the plot, the house, and the paperwork and taxes. With our modular homes, the house ranges from €156,000 + VAT for the Model 100 to €494,550 + VAT for the Model 350, with the architectural project, building licence and site supervision included. On top of that come the items that depend on your land and what the town hall, the notary and the tax office charge.
Here we go through each item, what is included in our fixed price and what is not, so you know what budget you need before you start.
Every item at a glance
| Item | What it is | Included? |
|---|---|---|
| Plot | Buying the buildable land | No |
| Surveys | Geotechnical and topographic: what the ground is like and the exact shape of the plot | Yes |
| Project | Basic and execution project: the plans and documents for the licence and the build | Yes |
| Licence | The fee and tax the town hall charges to authorise the build | No |
| Supervision | Site supervision: the professionals who manage and sign off the build | Yes |
| Safety | Health and safety coordination during the build | Yes |
| The house | Manufacturing the modules and installing them on your plot | Yes |
| Slab | Continuous reinforced concrete foundation | Yes, if the ground allows it |
| Special foundation | Only if the geotechnical survey requires it | No |
| Earthworks | Levelling the plot or making room for the slab | No |
| Transport | Of the modules, from the factory to your plot | No |
| Connections | Utility connections: the length of connection to electricity, water, sewerage and telecoms | No |
| Certificates | And final documentation, to connect the utilities | Yes |
| Deed | New-build deed and registration, to put the house in your name | No |
| VAT | Tax on the construction | No |
| Mortgage | Valuation, notary, registration and other costs, if you finance | No |
1. The plot
This is the item that varies most: it depends on the area, the size and the services nearby. If you do not have one yet, also allow for the purchase costs: taxes, notary and registration.
Before you buy, check with the town hall that a home can be built on it. A cheap rural plot is not necessarily a buildable one. We explain this in the article on the building licence for a prefab house.
2. The project and technical surveys
To apply for the building licence you need a project signed by a qualified professional. And to get the foundation right, you need a geotechnical survey and a topographic survey of the plot.
On a custom build, these fees are paid separately. With our homes they are part of the fixed price: the basic and execution project, the geotechnical and topographic surveys, site supervision and health and safety coordination.
3. The building licence: fees and construction tax
The town hall charges a fee for processing the licence and the construction, installations and works tax (ICIO). Each municipality sets the ICIO as a percentage of the cost of the build, up to a legal maximum of 4%.
As they change from one town to another, they are not included in our price. Ask your town hall how much they are before you finalise your budget.
4. Building the house
This is the largest item. There are two ways to get there:
- A traditional custom build. The quote is itemised for your project and can change if decisions or unexpected issues come up during the build.
- A catalogue modular home. The price of the house is fixed from the start because each model is defined in advance.
These are some of our fixed prices, with the architectural project, building licence and site supervision included:
| Model | Floor area | Price + VAT |
|---|---|---|
| Model 100 | 100 m² | €156,000 |
| Model 150 | 150 m² | €205,350 |
| Model 200 | 200 m² | €282,600 |
| Model 350 | 350 m² | €494,550 |
You can see all ten in the catalogue with prices and photos. If you are weighing up sizes, in how much it costs to build a 100 m² house we break down the most popular case.
5. What depends on your plot
Some items cannot be known without seeing the land:
- Transport: depending on the distance from Alicante and the number of modules.
- Earthworks: if the plot slopes or needs levelling.
- Special foundations: only if the geotechnical survey requires them. If the ground allows it, the continuous slab is already included.
- Utility connections: the length of connection to the electricity, water, sewerage and telecoms networks.
- Ancillary buildings: a pool, garage or others.
A flat plot with services at the gate and good access will have few extra items. A sloping one, far away or without utility connections nearby, will have more.
6. Taxes and costs at the end
When the house is finished, a few steps still have a cost:
- VAT on the construction.
- The deed declaring the new build (declaración de obra nueva) before a notary and its entry in the Land Registry. The deed pays stamp duty (actos jurídicos documentados), which each autonomous community sets.
- The first occupation licence or declaration, depending on the municipality.
- Connecting the utilities: electricity and water.
Your notary and your town hall will give you the exact figures for your case.
7. If you finance the house
To build on your own plot, people usually take out a self-build mortgage, where the bank releases the money in stages. It has its own costs: valuation, notary and registration, among others. We explain it in mortgage for a prefab house.
If you do not live in Spain
If you are building a home on the Costa Blanca from abroad, the steps are the same, with a few extra points:
- NIE. You need a foreigner identification number to buy the plot, sign contracts and pay taxes in Spain.
- A Spanish bank account makes it easier to pay for the plot, the build and the taxes.
- Mortgage. Spanish banks also lend to non-residents, usually on different terms from residents. Ask several banks before you commit.
- Independent advice. Before buying the plot, it is worth having a lawyer check the planning report and the purchase contract.
Modular or traditional: what changes in the sums
A modular home is not always cheaper than a traditional one. What changes is how certain the figure is and how long it takes:
- Fixed price. The house, the project, the licence and site supervision come in a single figure that does not change during the build.
- Shorter build time. The modules are made in the factory while the foundation is laid. Once the licence is granted, the build takes about six months.
- A single point of contact for the project, the licence and the build.
You will find the full comparison in modular vs traditional house.
How to fix the figure before you start
- Secure the plot with a planning report from the town hall before you buy it.
- Ask for the quote with the location, so that the land-related items come already priced.
- Ask your town hall about the licence fee and the ICIO.
- Get terms from several banks, if you are financing, with the quote in hand.